Intelligent engineering management modeling for computer technology and data mining.
Published In: International Journal of Modeling, Simulation & Scientific Computing, 2024, v. 15, n. 2. P. 1 1 of 3
Database: Applied Science & Technology Source Ultimate 2 of 3
Authored By: Feng, Ning; Shabaz, Mohammad; Elashiri, Mohamed A.; Arias-Gonzáles, José Luis; Chaudhury, Sushovan; Al-Masoudy, Miami Abdul Aziz; Oyebode, Oluwadare Joshua 3 of 3
Abstract
The author suggests using computer technology and data mining in intelligent engineering management to increase the management capacity of engineering projects and decrease the consumption of construction expenses. The emphasis is mostly on theoretical and analytical approaches to problems of practical concern for data mining, perhaps in combination with other conventional tools, and the associated applications to engineers and managers of various industrial sectors. This has immediate benefits for both academic and applied data mining researchers as well as research students. The author developed a BIM project management system based on Browser/Server architecture and Client/Server architecture in conjunction with BIM technology and the BIM 4D model. To execute complete project management of business management, real-time control, and decision support, the system must establish and use its business logic and data exchange link. Each module in the 4D construction dynamic management subsystem recognizes dynamic management of the construction process, and the working duration of each module is determined by calculating by using the unified engineering decomposition principle, rationalizing the relevant data through time parameters, recording the acquired management data and storing it in the BIM database, and connecting the BIM database bi-directionally through the web server through the system integration. The results showed that when the time is 20 min, the throughput of the system is higher than 2 7 × 1 0 3 kb/s. The system can effectively improve the project management ability, reduce the construction cost and construction period of the project, and the system responds quickly. [ABSTRACT FROM AUTHOR]
Additional Information
- Source:International Journal of Modeling, Simulation & Scientific Computing. 2024/04, Vol. 15, Issue 2, p1
- Document Type:Article
- Subject Area:Engineering
- Publication Date:2024
- ISSN:17939623
- DOI:10.1142/S1793962324410101
- Accession Number:177091167
- Copyright Statement:Copyright of International Journal of Modeling, Simulation & Scientific Computing is the property of World Scientific Publishing Company and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Looking to go deeper into this topic? Look for more articles on EBSCOhost.